Logistic building constructionin Carpi (Mo)

Realizzazione del polo logistico di Carpi (Mo)

The works include the redevelopment of a former "combustion turbine" plant in Carpi (Modena). The existing structure will be demolished to allow for the construction of a logistic hub for the management of materials within the ENEL (main italian electrical energy provider) production cycle. The building will cover an area of approx. 50,000 square meters. The construction includes: 1 industrial building (pre-fabricated structure, 20,000 square meters footprint), external storage aprons (17,000 square meters), internal roads (13,000 square emters), and related systems ( waste water, electrical network, firefighting system, etc.)

TECHNICAL SPECIFICATIONS

Employer: Enel S.p.A

Works amount: € 6.651.691

Works start: 1 January 2018

Works end: 30 September 2019

Copyright © 2018. All Rights Reserved Gruppo ICM SPA - 36100 - VICENZA Viale dell'Industria 42 Tel. 0444/336111 Fax 0444/961541 P.IVA - 02526350240 - Privacy e Policy
Powered by Tech&WebSolutions.it