REHABILITATION OF MAAI MAHIU-NAROK ROAD – N. RD/457 - KENYA

Riabilitazione della strada Mahiu - Narok (Kenya)
Rehabilitation of the road between Maai Mahiu - Narok on the category “A” the maximum category in Kenya consist in the complete rehabilitation of the road to accommodate a new 7.0 m wide carriageway and 1.5m wide shoulders on either side. Construction of new sub base layer by recycling and stabilization of existing pavement layers together with imported materials. The total length of the road is 90 km and the new basement structure is 350 mm thick of stabilized sub base with 3% of cement, 170 mm thick of foam bitumen as base and the cape seal 2 cm thick with asphalt slurry as wearing course.

TECHNICAL SPECIFICATIONS

Employer: Ministry of Roads and Public Works - Kenya

Works amount: € 55.674.689,80 (nostra quota lavori 95%)

Works start: 02 october 2006

Works end: 09 June 2010

Copyright © 2018. All Rights Reserved Gruppo ICM SPA - 36100 - VICENZA Viale dell'Industria 42 Tel. 0444/336111 Fax 0444/961541 P.IVA - 02526350240 - Privacy e Policy
Powered by Tech&WebSolutions.it

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
Ok