• Home
  • PROJECTS INFRASTRUCTURE
  • Gallerie
  • Realizzazione attivita’ operative connesse con l’assessment gallerie nelle competenze della direzione 1° tronco di genova (aut. a10, a7, a26)

Tunnel assessment operational activities on motorways a10, a7, a26 under the management of “1° tronco” genova.

Realizzazione attivita’ operative connesse con l’assessment gallerie nelle competenze della direzione 1° tronco di genova (aut. a10, a7, a26)

Restoration and consolidation works connected with the assessment of the tunnels under the responsibility of the “1° tronco” of Genova, in the A10 A7 and A26 motorways.

Mostly, works consist in the removal of the existing deteriorated protections and in their replacement with new protections consisting of metal meshes and corrugated sheets in stainless steel.

TECHNICAL SPECIFICATIONS

Employer: Autostrade per l'Italia S.p.A.

Works amount: 4.650.000 EURO - Our share: 100%

Works start: 21/05/2020

Works end: 09/10/2020

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy and Policy