NOVI-VINODOLSKI MOTORWAY BYPASS ON THE A7 RUPA-RIKEKA-ZUTA LOVKA (PHASE 1)

PASSANTE AUTOSTRADALE DI NOVI-VINODOLSKI SULL'AUTOSTRADA A7 RUPA - RIJEKA - ZUTA LOKVA (fase 1)

The works include the construction of the left carriageway of the A7 Selce-Novi Vinodolski motorway section, with a length of 7.6 km (the roadway / embankment works will affect the entire motorway area). The main works to be carried out are the Zagori Gallery, about 800 meters long, of which both the right and left pipes will be built, and the Ricina viaduct, 1062 meters long, which will be built only on the left carriageway. The work is completed by the construction of the two junctions connecting the D8 state road, one at the beginning and one at the end of the lot.

TECHNICAL SPECIFICATIONS

Employer: HRVATSKE AUTOCESTE d.o.o.

Works amount: 63.180.400 EURO - Our share: 50%

Works start: 10/2021

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy and Policy