VALDICHIANA SUPPLY SYSTEM - LOT II

Adduzioni Valdichiana II Lotto II Stralcio completamento

The work consists in the completion of a line of water supply for irrigation of agricultural areas. The main activities were carried out consisting of the supply and installation of approximately 5000 m steel pipes with a diameter of 2000 mm to about 1500 m, 2400 mm to about 1250 m, 3000 mm to about 1600 m and 700 m of other pipes with diameters less. The pipes are made of steel Fe510 Sp. 20 mm welded helically submerged arc coated with epoxy coating inside toxic by law and external bituminous heavy class IV and will be provided and installed (by digging trenches) in bars of 12 m that will end belled and will be welded between them in work at the construction site.

TECHNICAL SPECIFICATIONS

Employer: Ente Irriguo Umbro Toscano

Works amount: € 9.660.000,00

Works start: 9 July 2009

Works end: 10 Semptember 2010

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy and Policy