A26 LINZER AUTOBAHN – CONSTRUCTION OF A BRIDGE AND JUNCTION TUNNEL

Autostrada A26 “Linzer Autobahn” – Costruzione di un ponte e dei tunnel di collegamento

The A26 Linzer Autobahn Project “Etappe 1” consists in two lots: one for the construction of a 385-meter 4-lane cable-stayed bridge on the Donau and one for the construction of north-bound and south-bound junction tunnels for a total length of 3.3 km approximately. Other connected works include the construction of a tunnel operation center and other supporting buildings necessary for the supervision of the infrastructure, rock stabilization and implementation of safety measures. ICM is the leader of a Joint Venture made up of an Austrian company and an Italian metal carpentry partner. Construction works are expected to start by mid October, the bridge works will commence first, and the tunnels will be built at a later stage. Total construction duration is about 49 months.

TECHNICAL SPECIFICATIONS

Employer: Asfinag (Società Autostrade Austriache)

Works amount: € 132.000.000

Works start: 19 November 2018

Works end: 2023

Copyright © 2018. All Rights Reserved Gruppo ICM SPA - 36100 - VICENZA Viale dell'Industria 42 Tel. 0444/336111 Fax 0444/961541 P.IVA - 02526350240 - Privacy e Policy
Powered by Tech&WebSolutions.it