MSEILHA DAM CONSTRUCTION (LEBANON)

Costruzione della diga mseilha (libano)

The works comprise :
a) an embankment dam 400 m long and 35 m high,
b) a temporary diversion tunnel on left bank 255m long and 4m diameter with D cross section transformed at final stage in bottom outlet and assuring the passage of a water supply pipe to a treatment station (not included in this project)
c) a circular spillway shaft 27m high and 10m diameter as well as a tail race tunnel 131 m long and 9m diameter.
d) a three levels water intake structure on left bank.

TECHNICAL SPECIFICATIONS

Employer: Repubblica del Libano - Ministero dell'Energia e dell'Acqua

Works amount: € 57.832.550,50

Works start: 01 May 2013

Works end: 07/10/2019