Metropolitana di Napoli, LINE 1 – FUNCTIONAL STRETCH “STAZIONE TRIBUNALE”

Metropolitana di Napoli, Linea 1 – tratta funzionale “stazione tribunale”

The functional stretch "Stazione Tribunale" belongs to the metro line that connects the Centro Direzionale with Naples Airport Capodichino.

The contract includes the construction of:

  • Tribunale Station, 118 m developments, three-track station;
  • Tunnel between Centro Direzionale and Tribunale: 154 m refurbishment and 152 m new construction;
  • Tunnel between Tribunale and Poggioreale station;
  • Ventilation room;
  • MEP systems.

The concept and architectural design are entrusted to the renown architect Mario Botta.

TECHNICAL SPECIFICATIONS

Employer: METROPOLITANA DI NAPOLI SPA

Works amount: € 67.768.807,84

Works start: 30 June 2016

Works end: in progress

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy and Policy