Metropolitana di Napoli, LINE 1 – FUNCTIONAL STRETCH “STAZIONE TRIBUNALE”
The functional stretch "Stazione Tribunale" belongs to the metro line that connects the Centro Direzionale with Naples Airport Capodichino.
The contract includes the construction of:
- Tribunale Station, 118 m developments, three-track station;
- Tunnel between Centro Direzionale and Tribunale: 154 m refurbishment and 152 m new construction;
- Tunnel between Tribunale and Poggioreale station;
- Ventilation room;
- MEP systems.
The concept and architectural design are entrusted to the renown architect Mario Botta.
TECHNICAL SPECIFICATIONS
Employer: METROPOLITANA DI NAPOLI SPA
Works amount: € 67.768.807,84
Works start: 30 June 2016
Works end: in progress