METROPOLITANA DI NAPOLI, LINE 6 – “STAZIONE CHIAIA” AND CONNECTED WORKS
The functional stretch "Stazione Chiaia" belongs to the metro line that connects Municipio and Mergellina.
The contract includes the construction of:
- Chiaia Station (40 m vertical development), square station shaft with 30m side, built using bottom-up method;
- Tunnels extension and enlargement;
- Ventilation Rooms construction.
The architectural design is entrusted to Arch. Umberto Siola, whereas the artistic design is entrusted to the film maker Peter Greenaway.
TECHNICAL SPECIFICATIONS
Employer: METROPOLITANA DI NAPOLI SPA
Works amount: € 62.190.605
Works start: 2 October 2016
Works end: in progress