Design and construction of the Zagreb Pier Container Terminal - 1st Phase - Rijeka (Croatia)

Progettazione e costruzione del Zagabria Pier Terminal Container - 1° Fase - Rijeka (Croazia)

The work is focused on the design and construction of a quay (400 mt lenght), adjacent to the existing quay, in the port.

TECHNICAL SPECIFICATIONS

Employer: Autorità Portuale di Rijeka

Works amount: € 70.585.015,45

Works start: 1 June 2012

Works end: 2018