MONTECCHIO MAGGIORE TOLL STATION AND CONNECTING ROADS CONSTRUCTION

Realizzazione delle opere di completamento della nuova autostazione di montecchio maggiore e collegamenti con la viabilità ordinaria

The overall road development is approximately 5800 m, of which 2000 m of motorway and 3800 m of ramps.

The main works consist of:

  • Railway tunnel crossing the highway, single tube, 175 m x 16.4 m wide.
  • Single tube highway underpass, 76 m x 10 m wide.
  • Viaduct with a mixed steel-concrete structure, with a total length of 188 m and a width of 14 m, with four spans 45 m, 35 m, 70 m and 38 m long.
  • Railway Gallery for crossing ramps, consisting of two tubes respectively of 77 m in length and 16 m in width, 86 m in length and 12.5 m in width.
  • Construction of a railway underpass of the Milan-Venice High speed line.

The construction project management as well as the AS BUILT documents will be performed in a BIM environment.

TECHNICAL SPECIFICATIONS

Employer: Autostrada Brescia Verona Vicenza Padova S.p.a.

Works amount: € 56.813.343,42 - Our share: 60%

Works start: July 2019

Works end: ongoing

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

Gruppo ICM SPA - Copyright © 2018 - All Rights Reserved

Privacy and Policy